Weekly Construction Update November 16 to 20

The nice fall weather has helped crews tie up work on several projects over the last week and start on a few others. Here is what’s happening for maintenance and construction work in Beaumont this week:

New projects/updates:

  • Sanitary sewer line repair: Most work is complete and paving along 47 Street is finished. Sidewalk and landscape restoration will take place in the spring.
  • 50 Avenue water feedline construction:
    • Progress update for east of 50 Street: Paving between the St. Vital pumphouse and 48 Street is complete. Some restoration work remains at the far east end of 50 Avenue.
    • Progress update for west of 50 Street: Feedline installation in front of École Bellevue School to the staff lot west access is complete. Some temporary paving is in place in front of the school ahead of winter. Final paving restoration will be completed in the spring.
    • Eastbound traffic lanes along 50 Ave remain closed while the contractor uses the lane for a construction laydown area. The lanes will re-open over the next two weeks as the contractor moves equipment out of the area.
    • The contractor is trying to get as much work done as possible before freezing temperatures set in. Crews will return in spring 2027 to finish the areas that may not get completed, including pipe installation to the west of École Bellevue School, tie-ins at both the St. Vital and Main pumphouses and the remaining project paving and restoration.
  • Wastewater system renewal work: A contractor is completing sewer and manhole cleaning and televising lines at several locations in Beaumont.This helps the City see the condition of the pipes and manholes to keep underground infrastructure in good shape, as well as identify and prioritize any future repairs that may be needed. While work is completed, residents may notice:
    • Crews and equipment on or near your street for a short time.
    • Temporary lane closures and parking restrictions. Please follow signs and any detours in place.
    • Slight odours near open manholes while work takes place.

Ongoing projects:

  • Water valve and catch basin concrete repairs: Crews are repairing concrete near several water valves and catch basins at multiple locations. Temporary lane and parking closures may be in place while this work is completed.
  • Sidewalk and parking lane closures – Forest Heights: Crews are completing shallow utility installations near 40 St and 47 Avenue in the Forest Heights area. Sidewalk and parking lane closures will be in place while the work is completed.
  • Construction traffic – Coloniale Way: Heavy construction traffic is expected near the 9 Coloniale commercial development due to clay hauling. Please slow down and watch for crossing vehicles.
  • Winter preparation: The Public Works team is preparing for winter, including winterizing fire hydrants, prepping roads and pathways and getting equipment ready. Parks crews continue to prune and remove damaged trees and shrubs while the weather cooperates.
  • Ball diamond safety netting – Four Seasons Park: Safety netting has been installed at the West Recreation Site and installation continues at the Four Seasons ball diamonds. Temporary fencing has also been installed near the dog park for additional safety measures while this work is being completed.
  • Washroom renovations – Ken Nichol Regional Recreation Centre: The downstairs washrooms are closed for renovations. Use the upper lobby washrooms.

* Projects may be added or revised throughout the week when new details are received. Dates and schedules are approximate and may change due to weather conditions, contractor availability, schedule changes and other unforeseen factors.