General Design Standards

General Engineering Design Standards

The City of Beaumont has revised its General Design Standards, and the effective date of these new standards is May 1, 2021.  To assist with transition, engineering drawings submitted in 2021 with a subdivision or development that was approved prior to May 1, 2021 may use either the 2021 version or the  2011 version.  For subdivisions or development approved after May 1, 2021, engineering drawings must follow the 2021 version of the General Design Standards.   

All engineering submissions received after July 1, 2021 shall follow the 2021 General Design Standards.  

If you are unsure of the version that you are able to use please contact engineering@beaumont.ab.ca for clarity.

General Design Standards 2021, effective May 1, 2021

  • Click here to view the current version.

General Design Standards 2011

  • Click here to view the 2011 version.

For further information or for any inquiries please contact engineering@beaumont.ab.ca.