Road, Sidewalk & Trail Maintenance

From mid-March to mid-October, repairs are undertaken on the streets, lanes, curbs, gutters and sidewalks identified in the regular patrols and annual survey of conditions. All the repairs are prioritized and the most severe ones are scheduled first.

Street Repairs


  • Pothole patching with either hot or cold mix products depending on the time of year
  • Resurfacing asphalt streets to avoid costly reconstruction and provide a smooth surface for vehicles
  • Router and seal cracks in streets to stop water from damaging the road base
  • Grading gravel perimeter roads to maintain good drainage and an even surface

Lane Repairs


  • Grading gravel lanes to maintain proper drainage and an even surface
  • Reconstructing lanes that have poor drainage
  • Patching asphalt aprons

Sidewalk & Trail Repairs


  • Repairing sidewalks and trails to eliminate defects that are detrimental to public safety
  • Repairing curbs and gutters to improve water drainage
  1. Current Road Maintenance

From June 2 - 3 we will be repairing the dip in the road that goes across 50th street at the intersection/turn into for the Tim Horton's and Bank of Commerce parking lot. 

This will affect traffic going in both directions and access will be modified while work is in progress. Please follow all posted street signage and reduce your speed. 

June 2 road construction