A community space, in the heart of Beaumont.
This exciting initiative, led by the City of Beaumont, aims to transform Centre-Ville Park into a gathering space for the residents of Beaumont. The Centre-Ville Park concept design is intended to:
- Enhance landscaping,
- Integrate with the 50th Street streetscape and
- Provide an open space to host small gatherings and events.
For more details and updates on the beautification of Centre-Ville Park, see below!
Project Background
The City of Beaumont is advancing the concept design to beautify Centre-Ville Park, with construction set to begin in Fall 2023. Creating a vibrant space for locals and visitors to gather year-round and support business in the heart of Beaumont, this park design also aligns with the Centre-Ville Area Redevelopment Plan.
The concept design provides enhancements like:
- A design theme similar to the 50th Street streetscape.
- Grassed area for events and other community programming.
- Added trees, shrubs and various greenery.
- Plaza with decorative paving and seating (includes seating alcoves for accessible use).
- Gravel pathways.
The concept design also retains features from the current park such as:
- Access and location for food truck parking in the north paved portion for festivals and other events.
- Access and location for the Karma Pantry and Library Box.
- Existing trees along the west boundary of the park adjoining the parking lot.
- Some parking spaces along the south boundary, including 2 accessible parking spots.
Project Schedule
- Concept Design – Summer 2023
- Preliminary/Detailed Design – Summer 2023
- Construction – Fall 2023
This page will be updated throughout the project lifecycle, check back here to follow progress.
Why is Centre-Ville Park being beautified?
The Centre-Ville Park is being redesigned to enhance its overall aesthetics, create a more welcoming gathering space and align with the Centre-Ville Area Redevelopment Plan. The project aims to revitalize the park and support local businesses, all while providing a vibrant downtown space for residents and visitors to enjoy.
Will the park remain open during the construction phase?
We understand the importance of the park to the community. While there may be temporary closures or restricted access during certain phases of construction, we will make every effort to minimize disruptions and ensure that the park resumes accessibility as soon as possible. We appreciate your patience and cooperation during this period.
What amenities and features will be added to the park?
The concept design for Centre-Ville Park includes several enhancements, such as a design theme similar to the 50th streetscape, shrubs and greenery, a grassed area for events and community programming, gravel walkways, a plaza with seating and a new location for the Karma Pantry and Library Box. These additions will transform the park into a more attractive and functional space for residents and visitors alike.
Will there be designated areas for children to play in the redesigned park?
While the concept design doesn't specifically outline designated play areas, the grassed area and open spaces will provide ample room for children to play and engage in various activities.
Will the beautification affect parking availability near the park?
The project aims to retain some parking spaces along the south boundary of the park, including two accessible parking spots. However, please note that there may be temporary adjustments to parking arrangements during the construction phase. We will strive to communicate any changes or alternative parking options to minimize inconvenience.
What is happening to the Karma Pantry and Library Box?
We recognize these resources are important to our community therefore, both the Karma Pantry and Library Box will remain in Centre-Ville Park. These resources will simply be found in a new location within the park.
How can I stay informed about the progress of the project?
We will regularly update this webpage throughout the project's lifecycle, sharing important announcements and updates. We encourage you to visit the webpage frequently to stay up-to-date. You can also contact our dedicated project team at publicworks@beaumont.ab.ca or call 780-929-4300 if you have specific questions.