BSRC November 2019 Construction Update
  • Interior door frames installation almost complete.
  • Ceiling grid currently being installed.
  • The installation of concrete bleachers has begun.
  • The asphalt for north and west driving lanes of the parking lot has been poured. The remainder of the parking is scheduled for pouring next spring.
  • All stairs have been installed.
  • The exterior finish installation has begun.
  • Most interior concrete has been poured.
  • Most exterior sidewalks and curbs have been poured, except those directly adjacent to the building and the main road.
  • Installation of drywall on the second floor is almost complete and painting on that floor has begun.
  • Drywall installation is ongoing on the main floor.

20191114_154521

Beaumont Council voted on September 11, to proceed with a $29.5 million dollar renovation to the Aqua-Fit Centre. Construction is scheduled to begin October 2018. Council also approved the Aqua-Fit Phase 2 name change to Beaumont Sport and Recreation Centre / centre sportif et de loisirs Beaumont.

Beaumont Sport and Recreation Centre Project is an expansion and modernization of the existing Aqua-Fit Centre to include a National Hockey League-sized ice surface, an indoor Fieldhouse (multi-sport amenity), a high school gymnasium, a climbing wall and a suspended running track. Other updates will include mechanical updates to the pool filtration system.

BSRC Aerial_title


Social Media 


Follow us on social media: Facebook or Twitter. Sign up for the Our Beaumont mailing list by emailing us.

Project Details

 

Over the past two years, Administration and BR2 Architects have been working with the users, community groups and residents on the Aqua-Fit Phase 2 Project. The Project is to be built on the lands adjacent to the Aqua-Fit pool, and include the following amenities:

  •    NHL sized ice with seating and viewing areas
  •    Fieldhouse that can accommodate indoor soccer, lacrosse, and host events with seating
  •    High School gymnasium that can accommodate multi-court play
  •    Climbing-wall and running/walking track
  •    Concession, multi-purpose rooms, tuck shops and offices
  •    Pool improvements to mechanical and the building envelope.


Beaumont - Aqua-Fit Phase 2 Interior from BR2 Architecture on Vimeo.